How much 2-3 stone do you need?
Enter the size of your construction entrance or muddy work area. You get tons, cubic yards and truck loads of 2-3 stone.
You need about
0 tons
0cubic yards
Add your truck size to see loads
for this job
How this was worked out
Assumes 2-3 stone at 1.45 tons per cubic yard. Other gravel weighs a little more or less, so ask your supplier for their number.
-
About 2-3 stone
2-3 stone, often just called 2-3s, is a mix of #2 and #3 crushed stone, with pieces from about 1 inch to about 3 inches across. It is clean stone with no dust, so it lets water through and does not turn to paste in the rain. Builders lay it at the entrance of a job site so trucks drop their mud on the rock and not on the road.
How many dump truck loads do I need?
More about 2-3 stone
On the standard size chart, #3 stone runs from about 2 inches down to 1 inch and #2 runs a little bigger, up to about 3 inches. Selling them mixed gives a rock bed with a range of sizes that locks together better than one size alone. If the board at your yard does not list 2-3s, ask for #2 and #3 stone mixed together.
For a construction entrance, many local erosion rules ask for a pad of large stone about 6 inches thick and at least 50 feet long, laid over filter fabric. Check what your city or county asks for before you build it, since the rules differ from place to place. The pad gets packed with mud over time, and a fresh layer on top keeps it working.
On a soft farm lane or a muddy spot by a barn gate, spread 4 to 6 inches of 2-3s first and drive it in, then top it with crusher run so the surface is smooth enough to walk on. Rain drains through the big gaps fast, and the stone weighs about the same wet or dry.