How much patch for a pothole?
Measure the hole after you clean it out. You get bags of cold patch, or tons of hot mix for a cut-out.
Example numbers. Type your own.
You need about
4 bags of cold patch
9square feet
1.5cubic feet of patch
for the patch
How this was worked out
- Area: 3 ft × 3 ft = 9 sq ft
- Depth: 9 sq ft × 2 in ÷ 12 = 1.5 cu ft of patch
- 9 sq ft × 2 in = 18 sq ft at 1 in deep
- 18 sq ft × 1.1 (10% extra for packing) ÷ 6 sq ft a bag at 1 in = 3.3 → 4 bags of 50 lb, rounded up
The depth is the hole once the loose bits are out. Bags are rounded up to whole bags, and the hot mix tons carry the extra for packing.
-
About patching a pothole
Dig out the loose stone, dirt and broken edges first, then sweep the hole and let it dry. Measure after you clean it out, so the depth you type is the real one. Most holes turn out deeper than they look from the top.
Cold patch goes in about an inch at a time, and each layer gets pounded down hard before the next one. Most bags are made for holes up to 2 or 3 inches deep. It packs down a lot, so a deep hole takes more bags than you would guess. That is what the extra for packing is for.
A 50 lb bag fills about 6 square feet an inch deep. Bags from other makers fill a bit more or less, so check yours and type its number in the box.
Keep bag repairs to about 3 by 3 feet. A bigger hole is better cut out with square edges and filled with hot mix. Hot mix is sold by the ton, and most plants have a smallest amount they will load, so ask the plant first.
Give a patch a month or more to cure before you seal over it. The sealcoat calculator works out the sealer for that job.