A 4 x 11 ft slab is 44 square feet. Here are its bags and cubic yards, worked out, with the calculator ready if yours is thicker or thinner.
You need about
27 bags of 80 lb concrete
0.60cubic yards
for this job
How this was worked out
- Slab: 11 ft × 4 ft × (4 in ÷ 12) = 14.7 cu ft
- 14.7 cu ft × 1.1 (10% extra for waste) = 16.1 cu ft
- 16.1 cu ft ÷ 27 = 0.60 cu yd
- 16.1 cu ft ÷ 0.60 cu ft an 80 lb bag, rounded up = 27 bags
Bag sizes from the maker's data sheet for plain concrete mix. Bags are rounded up, so you do not come up one short. The 50 lb figure, 0.375 cu ft, is worked out by weight from the 80 lb bag, not read off a bag, so check the bag.
-
Bags by size
Bag Cubic feet each Bags 80 lb 0.60 27 60 lb 0.45 36 50 lb 0.375 44 40 lb 0.30 54
-
By thickness, with 10% extra for waste
Thickness Cubic yards 80 lb bags 60 lb bags 40 lb bags 4 in 0.60 27 36 54 5 in 0.75 34 45 68 6 in 0.90 41 54 81
-
About a 4x11 slab
A 4x11 slab covers 44 square feet. Poured 4 inches thick, a 4x11 slab holds 14.7 cubic feet of concrete, or 0.60 cubic yards with 10 percent extra for waste. That is 27 bags of 80 lb mix, 36 of 60 lb or 54 of 40 lb for the 4x11 size, rounded up to whole bags.
Garage floors and heavy driveways are often 5 to 6 inches thick, says the Concrete Network guide; at 6 inches a 4x11 slab takes 0.90 cubic yards. If that is more than you want to mix by hand, a truck of ready-mix is the other way to fill a 4x11 pour.
If yours is not quite 4x11, type your own length and width in the calculator above.