How much asphalt for a parking lot?
Measure the paved area, say what drives on it and what the ground is like. You get hot mix tons, truck loads and the accessible stalls the rules call for.
Example numbers. Type your own.
You need about
529.4 tons of asphalt
25truck loads, the last 6% full
2accessible stalls, 1 a van stall
1,667square yards
for the asphalt
How this was worked out
- Area: 150 ft × 100 ft = 15,000 sq ft ÷ 9 = 1,666.67 sq yd
- Asphalt: 15,000 sq ft ÷ 9 × 110 lb × 5.5 in ÷ 2,000 = 504.17 tons
- 504.17 tons × 1.05 (5% extra for waste) = 529.3785 tons → 529.4 tons
- 529.4 tons ÷ 22 tons a truck = 24.06 → 25 truck loads, the last 6% full
- Accessible: 40 stalls is in the 26 to 50 row of the federal table = 2 accessible stalls
- Van stalls, 1 in 6 rounded up: 2 ÷ 6 = 0.33 → 1 of them a van stall
The thickness is after rolling, asphalt laid straight on prepared ground. Truck loads round up to whole trucks. The accessible stalls are the federal minimum.
-
About paving a parking lot
The starting thickness comes from a paving association's guide for lots. Its table is for asphalt laid straight on prepared ground, with no stone base, and the last 2 inches on top are the finer surface layer. Softer ground and heavier traffic each add inches.
Think about every truck that will come in. Garbage trucks and delivery vans turn a lot meant for cars into a truck lot. Pick Some trucks for fewer than 100 a day, Heavy trucks for 100 or more.
The number of accessible (ADA) stalls is the federal minimum from the national standards, and one in six of them, rounded up, has to be a van stall with a wider aisle. Local rules can ask for more, and the building office has the final say.
A typical stall is 9 by 18 feet, marked with 4 inch stripes. Slope the surface at least 2% so rain runs off instead of sitting. Painting the lines is a job of its own; the other paving and upkeep calculators are on the Asphalt page.