Asphalt More calculators

How much comes off when you mill?

Measure the area and the depth you are milling. You get tons of millings, the loose pile and the truck loads to haul it.

Example numbers. Type your own.

One answer, with the work shown. Measure the area and set the milling depth.

Coming off, about

110 tons of millings

5truck loads

62.7loose cubic yards in the pile

55.6cubic yards in place

How this was worked out

  1. Area: 300 ft × 30 ft = 9,000 sq ft ÷ 9 = 1,000 sq yd
  2. Millings: 9,000 sq ft ÷ 9 × 110 lb × 2 in ÷ 2,000 = 110 tons
  3. In place: 9,000 sq ft × 2 in ÷ 12 ÷ 27 = 55.56 → 55.6 cu yd
  4. Loose pile: 110 tons × 2,000 ÷ 130 lb a cu ft ÷ 27 = 62.68 → 62.7 cu yd loose
  5. 110 tons ÷ 22 tons a truck = 5 truck loads

Millings weigh what the pavement weighed, so the tons use the paving rule. The loose pile is worked from the tons shown. Truck loads round up to whole trucks.

Got an idea? Tell us how to make this better

How can we make this calculator better?

No names or phone numbers. Tell us what would make it better.

Save Provitly to your Home Screen

It then opens full screen from your Home Screen, like any other app. On iPhone or iPad, in Safari:

  1. Tap Share . If you don't see it, tap the three dots first.

  2. Scroll down and tap Add to Home Screen.

  3. Tap Add. The Provitly mark appears on your Home Screen.