Asphalt More calculators

How much stone and asphalt for a chip seal?

Measure the road or drive and pick the chip size. You get tons of stone, gallons of asphalt and the loads.

Example numbers. Type your own.

One answer, with the work shown. Measure the road or drive and pick the chip size.

You need about

14.6 tons of chip stone

385gallons of asphalt to shoot

1truck load, 66% full

1,111square yards

How this was worked out

  1. Area: 500 ft × 20 ft = 10,000 sq ft ÷ 9 = 1,111.11 sq yd
  2. Stone: 10,000 sq ft ÷ 9 × 25 lb a sq yd ÷ 2,000 = 13.89 tons
  3. 13.89 tons × 1.05 (5% extra for waste) = 14.5845 tons → 14.6 tons
  4. 14.6 tons ÷ 22 tons a truck = 0.66 → 1 truck load, 66% full
  5. Asphalt shot: 10,000 sq ft ÷ 9 × 0.33 gal a sq yd × 1.05 = 385 gal of asphalt

The rates start at the middle of a state spec's ranges. Truck loads carry the stone and round up to whole trucks.

Got an idea? Tell us how to make this better

How can we make this calculator better?

No names or phone numbers. Tell us what would make it better.

Save Provitly to your Home Screen

It then opens full screen from your Home Screen, like any other app. On iPhone or iPad, in Safari:

  1. Tap Share . If you don't see it, tap the three dots first.

  2. Scroll down and tap Add to Home Screen.

  3. Tap Add. The Provitly mark appears on your Home Screen.